东南铁路线于2006年开通,是I-25号铁路的19英里延伸 & 沿I-25号公路15英里到林肯,沿I-225号公路4英里到帕克路. This extension brings light rail into Lone Tree, with three new stations and an additional 1,300 parking spaces. 该项目于2016年开始设计和施工,并于2019年5月17日投入使用.

九游会在线

How much will it cost?

乘坐东南铁路支线需要当地票价(3美元).00), Regional fare ($5.25) or Airport fare ($10.50) depending on your destination. Discount fares apply for those who are eligible. To learn more about 九游会在线’s fares, visit our fare page.

3-Hour 九游会在线

local

$3.00
1-2 rail fare zones

regional

$5.25
3 rail fare zones

airport

$10.50
to / from DIA

Buy Tickets and Day 九游会在线

You can buy Day 九游会在线 using cash, 于任何一间“快速铁路运输服务”车站内的自动售票机缴费, or on the 九游会在线 Mobile Tickets app. “本地日票”可在服务当日的剩余时间内,无限制乘坐东南铁路支线. 本地日通票簿可在任何一家购买 九游会在线 Sales Outlet.

Learn more about ticket vending machines
Learn more about Day Pass

Monthly Pass

使用香港铁路运输公司的区域/机场月票,可在东南铁路支线或更远的地方乘坐无限次列车. Monthly 九游会在线 may be purchased at any 九游会在线 sales outletonline, on the 九游会在线 Mobile Tickets app, or at participating King Soopers and Safeway stores.

Learn more about Monthly Pass

EcoPass and CollegePass

东南铁路支线的服务包括在所有 EcoPass, CollegePass, and Neighborhood EcoPass 卡,包括往返丹佛机场站的SkyRide或 University of Colorado A Line at no additional charge.

Stations

The 九游会在线 Board of Directors authorized a 2.2014年7月,现有东南铁路3英里的延伸. Southeast Denver business associations, 公司和市政当局联合起来支持这条新的轻轨线路. 孤树市和该地区的利益相关者贡献了史无前例的2500万美元, 外加300万美元的实物捐助, land and right-of-way.

当地匹配的约12%的项目成本远远超过了2.5 percent match 九游会在线 asked of its local partners, 并帮助九游会在线成功地获得了该项目的联邦资金. 九游会在线从联邦运输管理局小起点资助项目中获得了9200万美元, as well as $9.400万来自纾缓拥挤及空气质素补助金. The total cost of the project is $233.1 million.

Thumbnail

Lincoln Station

  • Address:

    10203 Station Way
    Lone Tree, CO 80124
    United States

  • Car Parking: 1,734 spaces
  • Bike Parking: Yes
  • Connecting rail lines:
  • Connecting bus routes:
  • FlexRides:
Thumbnail

Sky Ridge Station

  • Address:

    9941 Trainstation Circle
    Lone Tree, CO 80124
    United States

  • Car Parking: No
  • Bike Parking: Yes
  • Connecting rail lines:
  • FlexRides:
Thumbnail

Lone Tree City Center Station

  • Address:

    11023 RidgeGate Pkwy
    Lone Tree, CO 80134
    United States

  • Car Parking: No
  • Bike Parking: No
  • Connecting rail lines:
Thumbnail

RidgeGate Parkway Station

  • Address:

    10791 S Havana Street
    Lone Tree, CO 80134
    United States

  • Car Parking: 1,300 spaces
  • Bike Parking: Yes
  • Connecting rail lines:

Parking

Parking your car:

  • RidgeGate Parkway Park-n-Ride停车场将于2019年10月21日起收费停车. Learn how to park at 九游会在线 facilities.

  • 根据你的车辆是否在“快速发展服务”服务区内登记而定. Check out how to park.

  • 如果你的车辆是在“快速运输服务”范围内注册的, 在九游会在线 Park-n-Rides停车24小时免费. After 24 hours, a $2.00 daily fee applies. You must pay before getting on the train.

  • If your vehicle is registered out of district, a $4.00 daily fee applies. You must pay before getting on the train.

  • Safety Tip: Don't advertise your absence. 带着你的停车收据,不要把它放在你的仪表板上.

  • 车辆连续停放不得超过30天. 车辆连续停放超过30天没有移动,可能会被罚款和拖走,费用由车主承担.

How To Pay For Parking

Pay onsite

A Line Parking

Look for the blue canopy and kiosk. You can pay in cash (exact change) or credit card.

Pay By Phone

Pay by Phone

Call 1-877-727-5951 (paying by phone will incur a nominal fee).

Pay Online

ParkMobile - Parking Made Simple

www.parkmobile.com or download the Parkmobile app.

您必须在现场付款,然后离开您的车辆. 不缴纳停车费用将被处以罚款. 带着你付过的停车罚单,注意安全,不要把它放在你的仪表盘上.

Timeline

2010
2008年开始进行最终环境评估,完成30%的基础工程
2011
项目团队开始进行环境评估(EA),以寻求联邦资金
2012
负责先进的基础工程,并与利益相关方协调项目范围. Small started的申请过程通过拨款开发和工程阶段进行.
2014
两国签署了《九游会在线》, EA承诺履行《九游会在线》的要求, a requirement for eligibility for federal funding
2015
该项目成为奥巴马总统2016年预算的一部分. 九游会在线董事会批准授予Balfour Beatty基础设施公司1.4亿美元的两阶段合同. (BBII)设计及建造东南铁路支线.
2016
预算案及拨款已签署,并发出继续工作通知书2 (NTP2). Construction begins on May 16, 2016.
2017
2017年5月,项目完成率达到50%. By end of 2017, all Right of Way was acquired, 该项目的三座桥梁已接近完工, platforms had been poured at all three stations, 所有三个牵引电力变电所都已安装完毕,RidgeGate停车场结构也取得了实质性进展.
2018
现有的轻铁服务与2.2018年3月,林肯站以南的E、F和R线延长了3英里. 该项目于2018年11月进入“综合测试”阶段,以检查铁路系统的所有组件并纠正任何问题. 工程基本完成, including bridges, stations, track and utilities, in December 2018. By end of 2018, 线路通电,测试列车开始运行,以验证线路的安全和正常工作.
2019
列车和信号系统的综合测试持续到2019年. 接下来,开始收入前测试阶段,模拟客运服务. E、F和R线支线于2019年5月17日开放服务.